OUR KEY PROJECTS

A few key projects we have been working on across the bridge, tunnel and marine sectors.

Screenshot 2026-02-14 104400.png

MAHSR INVERT BRIDGE

LOCATION: INDIA

The Mumbai-Ahmedabad High-Speed Rail (MAHSR) required highly specialized invert bridge for its tunnel boring machines (TBM) for rapid tunnel formations. As a First-in-India engineering requirement, the project demanded unprecedented dimensional tolerances and a zero-margin-for-error fabrication process to support the bullet train corridor.

The Stamenk Solution:

Leveraging our dynamic production model, we bypassed traditional logistical bottlenecks by mobilizing a strictly vetted, specialized fabrication unit. The complex geometry of the steel was rigorously mapped and simulated in our design hub before heavy manufacturing commenced.

The Result:

We successfully delivered a high-precision steel invert bridge that met rigorous international Tunnel Boring Standards, ensuring flawless concrete casting and keeping the client's aggressive construction timeline on track.

The Stamenk Solution:

Our engineering team designed a bespoke telescopic gangway specifically for marine-grade applications. The manufacturing process utilized specialized anti-corrosive welding techniques and required pinpoint precision for the integration of movement over multiple axis for the structure.

TELESCOPIC GANGWAYS

LOCATION: SAUDI ARABIA

The project required complex, multi-stage Telescopic gangways for secure ship-to-shore marine access. The structures needed to operate flawlessly under dynamic loads in highly corrosive offshore environments, all while strictly adhering to international maritime safety codes.

The Result:

A robust, fully functional marine access system built to endure extreme offshore conditions. The project successfully bridged the gap between complex digital design theory and heavy-duty physical reality for a major desalination plant.

BARGE SIDE -Model_page-0001.jpg

OTHER PROJECTS

ORGANISATIONS THAT TRUST US

download (2).png
unnamed.jpg
WhatsApp Image 2026-01-31 at 11.53.53 AM.jpeg
WhatsApp Image 2026-01-31 at 11.53.56 AM (1).jpeg
WhatsApp Image 2026-01-31 at 11.53.54 AM.jpeg
download (2).png
jsw_one_logo_edited.png
unnamed.jpg
WhatsApp Image 2026-01-31 at 11.53.53 AM.jpeg
WhatsApp Image 2026-01-31 at 11.53.56 AM (1).jpeg
WhatsApp Image 2026-01-31 at 11.53.54 AM.jpeg
bottom of page